Projects

“We have entrusted AQAL Limited with the development of our luxurious beachside apartments. Their honesty, integrity, and passionate attention to detail made them the clear choice for this project.."
Abdullahi & Habib
Directors of Baharini Luxury Apartments.
Real Estate

Baharini Luxury apartments

Coming Soon. 

Recent Projects

Below are ‘some‘ of the handed over projects. 

"The project has been successfully completed as directed, thanks to the expertise of our contractors, AQAL Limited."
Eng Elijah Chai
Kwale Water engineer
Rural development

Malomani Solar Booster pump

Aqal Ltd were able to install solar powered pump and construct a water tank . Please see below for an overview.

Construction of 100m3 underground clear water tank.

Installation of solar powered booster pump.

Installation of PVC chain linked fencing. 

Rural Development

Kizingo Dam Phase 2

Construction of 20m3 Composite Filtration System

Construction of 220m3 Clear Water Tank

Construction of 75m3 Underground Sump Tank

Construction of Guard House/Water Kiosk

Fully automated Solar Powered Submersible Pumps

2.2km 6 inch Mains Piplines

“The locals were thrilled to have access to clean, purified water, and this achievement is a testament to the contractor's expertise.”
ENG. Dan Kibuchi
Kwale County Water Department
“AQAL Ltd successfully delivered Phase 1 of the Dziweni Dam on schedule and within budget. I can confidently say that the community has greatly benefited from this project, gaining access to clean, filtered water for the first time in their lives.”
ENG. Hassan Nyawa
Kwale County Water Department
Rural Development

Dziweni dam phase 1

The project entailed the following: Construction of Earth Dam 150x150mx4m: Fencing around the Dam, construction of intake chamber, installation of a high lift solar pump, installation of raw water pipeline main, construction of 20m3 per hour composite filtration unit, construction of 50m3 Ferro cement fresh water tank, water kiosks and animal troughs.

Rural Development

8No. Boreholes in Kwale County

This project was by far one of the most logistic intensive projects Aqal has taken on in Kwale County due to the sites being in different locations which required precise and well thought out plan. The project consisted of 8 No. boreholes, equipped with fully automated electric borehole pumps, power grid installation in rural areas, construction of 6 meter water towers with 10,000L water tanks, community water points with 5000L water tanks. All sites had similar specifications. 

“Locations of these boreholes and water points were impossible to reach due to it being in a remote location/s but Aqal have wizzed through them with no time ”
ENG. Dan Kibuchi
Kwale County Water Department
Rural Development

4No. Boreholes in Kwale County

Construction of water towers, water community points and installation of full automated/solar pumps. 

“Locations of these boreholes and water points were impossible to reach due to it being in a remote location/s but Aqal have wizzed through them with no time ”
ENG. Dan Kibuchi
Kwale County Water Department
"Fatima Chani, the Governor of Kwale, inspected the project, and local residents confirmed that they now have a steady supply of water."
Fatuma Achani
Governor – Kwale County
Rural Development

Mabirikani, Mazeras – Fulugani Pipeline

Construction of 220m3 Mason water tank, 6 km Pipeline Network & Extension and construction of 3No.  Standard Water Kiosks. 

Rural Development

Katangini Water Drift Bridge – Kwale County

“The project was completed before its due time. It was built to a high standard ”

 
“The project was completed before its due time. It was built to a high standard ”
ENG. Dan Kibuchi
Kwale County Water Department
“Today we have commissioned Majomboni Mungano Water Project. I want to express my gratitude to all our partners.”
Salim Mvurya
Former Governor – Kwale County
Rural Development

Extension of Majimboni self help group water project – shimba hills.

The project entails:

  • Installation of Raw Water Main Pumps inside the river, Solar Hybrid,
  • 7km  Pipeline Network in Shimba Hills Town.
  • Construction of Wier,
  • Installation of High Lift Solar Hybrid Pump,
  • Construction of Composite Filtration Unit and Water Kiosks. 

We Provide the Best Service in Industry​

Do you want a project of such magnitude to be carried out then get in touch with us. Our agent will happily arrange a meeting with one our highly experienced member of staff.