Malomani Solar Booster pump
Aqal Ltd were able to install solar powered pump and construct a water tank . Please see below for an overview.
Construction of 100m3 underground clear water tank.
Installation of solar powered booster pump.
Installation of PVC chain linked fencing.
Rural Development
Kizingo Dam Phase 2
Construction of 20m3 Composite Filtration System
Construction of 220m3 Clear Water Tank
Construction of 75m3 Underground Sump Tank
Construction of Guard House/Water Kiosk
Fully automated Solar Powered Submersible Pumps
2.2km 6 inch Mains Piplines
Rural Development
Dziweni dam phase 1
The project entailed the following: Construction of Earth Dam 150x150mx4m: Fencing around the Dam, construction of intake chamber, installation of a high lift solar pump, installation of raw water pipeline main, construction of 20m3 per hour composite filtration unit, construction of 50m3 Ferro cement fresh water tank, water kiosks and animal troughs.
Rural Development
8No. Boreholes in Kwale County
This project was by far one of the most logistic intensive projects Aqal has taken on in Kwale County due to the sites being in different locations which required precise and well thought out plan. The project consisted of 8 No. boreholes, equipped with fully automated electric borehole pumps, power grid installation in rural areas, construction of 6 meter water towers with 10,000L water tanks, community water points with 5000L water tanks. All sites had similar specifications.
Rural Development
4No. Boreholes in Kwale County
Construction of water towers, water community points and installation of full automated/solar pumps.
Rural Development
Mabirikani, Mazeras – Fulugani Pipeline
Construction of 220m3 Mason water tank, 6 km Pipeline Network & Extension and construction of 3No. Standard Water Kiosks.
Rural Development
Katangini Water Drift Bridge – Kwale County
“The project was completed before its due time. It was built to a high standard ”
Rural Development
Extension of Majimboni self help group water project – shimba hills.
The project entails:
- Installation of Raw Water Main Pumps inside the river, Solar Hybrid,
- 7km Pipeline Network in Shimba Hills Town.
- Construction of Wier,
- Installation of High Lift Solar Hybrid Pump,
- Construction of Composite Filtration Unit and Water Kiosks.
We Provide the Best Service in Industry
Do you want a project of such magnitude to be carried out then get in touch with us. Our agent will happily arrange a meeting with one our highly experienced member of staff.